25 MW Greenfield Data Center — Frankfurt
Projects / Full Scope

25 MW Greenfield Data Center — Frankfurt

Frankfurt, Germany

IT Capacity

25 MW

Design Stage

LPH 1–4

Disciplines

5

Project Overview

A new 25 MW IT data center required complete multi-discipline engineering from concept through to building permit, delivered under HOAI Leistungsphasen 1–4. EDS designed the complete electrical infrastructure — MV intake, UPS and standby power architecture, LV distribution and lighting — together with an integrated BMS for centralised monitoring and control of power, cooling and building functions. Fire alarm design was developed in close coordination with data-center safety and emergency shutdown concepts. ICT and security systems addressed structured cabling, access control and surveillance, while BOS infrastructure was designed to meet authority requirements for emergency-services communication. All five disciplines were coordinated into a single coherent permit package for the Frankfurt building authority process.

Scope of Work

  • Electrical Systems Design
  • BMS & Building Automation
  • Fire Alarm & Shutdown Integration
  • ICT & Security Systems
  • BOS Systems
  • LPH 1–4 Permit Package

Your project, next.