Full ScopeEV Charging Parking Extension
The project involves the extension of an existing parking yard to create a dedicated parking area for electric vehicle charging. EDS delivered the full multi-discipline design scope across HOAI Leistungsphasen 3 and 5, covering MV electrical infrastructure and LV power distribution for the EV charging stations, external lighting design with supporting calculations, and landscape model coordination for the civil works. Rainwater drainage was designed and coordinated to integrate with the extended parking area, while BIM modelling ensured full interdisciplinary coordination across all design packages. The main challenge was to integrate the new EV charging infrastructure into the existing site while maintaining reliable power supply, safe cable routing, proper lighting levels, coordinated drainage, and buildable external works.
Design Stage
LPH 3, LPH 5
Building Type
Logistic
Disciplines
3




