Project Overview
A medium-scale greenfield data center for a 6 MW IT load in Berlin called for full engineering design from concept through permit under HOAI Leistungsphasen 1–4. EDS delivered an electrical systems design tailored to the facility's IT load, covering MV supply, UPS topology, LV distribution and standby power. The BMS scope provided centralised supervision of power distribution, cooling plant and building functions. Fire alarm, ICT and security systems were designed as an integrated package to achieve a secure, compliant facility, with BOS systems rounding out a complete multi-discipline submission. Each system was designed to the same standard applied to larger facilities and fully coordinated for authority review.
Scope of Work
- Electrical Systems Design
- BMS — Power, Cooling & Building
- Fire Alarm Systems
- ICT & Security Systems
- BOS Systems
- LPH 1–4 Permit Package
Also available in
DE 6-MW-Greenfield-Rechenzentrum — BerlinYour project, next.
Tell us about your data center challenge — we'll be back within one business day.