Project Type
Brownfield
Design Stage
Stage 1–4
Constraint
Live environment
Project Overview
Replacing UPS systems and battery banks in a fully operational data center requires meticulous coordination to eliminate any risk to live loads. EDS managed this brownfield upgrade from Stage 1 through Stage 4, developing a replacement strategy that sequenced equipment removal, new installation and battery commissioning around the facility's operational constraints. Electrical calculations were updated to reflect the new UPS capacities and protection settings across the affected distribution boards. The BIM model and all associated drawings were revised to as-built accuracy, providing the client with a reliable record for future maintenance and audit. Vendor coordination and equipment selection were handled by EDS to ensure the new systems matched the existing infrastructure topology and met the facility's power quality and autonomy requirements.
Scope of Work
- UPS Replacement — Live Environment
- Battery System Replacement
- Electrical Calculations Update
- BIM Model & Drawing Updates
- Vendor Coordination
- Equipment Selection
Also available in
DE USV-Austausch — Live-Rechenzentrum, FrankfurtYour project, next.
Tell us about your data center challenge — we'll be back within one business day.


